JORC Report PT. Gama Group Limestone Project

BSA provided drilling supervision, topographic survey, QAQC sampling, and mineral resources estimation comply with JORC code 2004 for limestone bayah project owned by PT. Gama Group. BSA eleveted the PT.Gama previous exploration into JORC Code best practice. The project was started in November 2012 to confirm the old drilling campaign with twin hole programme. Eight holes had been […]

Read More

JORC Report PT. IFISHDECO

BSA started drilling and JORC Technical Report in Tinanggea Nickel Project of PT IFISHDECO from February 29th until April 25th, 2011 using Jacro 200 Triple Tube HQ Drilling. There are 164 holes resulted within 2 blocks with total core production of 2854 meters. A completed 2D and 3D block models based on drilling data are generated. The […]

Read More